SAP S/4HANA Implementation for Manufacturing Giant
Implemented SAP S/4HANA for a $500M manufacturing company, migrating from SAP ECC 6.0 with zero production downtime — consolidating 12 country operations onto a single global instance.
- Client
- Global Manufacturing Corporation
- Industry
- Manufacturing
- Team size
- 10 members
- Duration
- 16 months
Key outcomes
-
30%
improvement in inventory accuracy
-
25%
faster financial close cycles
-
50%
cost savings vs. onshore
-
18
months to full rollout
The challenge
A US-based manufacturing company with $500M revenue and operations across 12 countries was running SAP ECC 6.0 — approaching end of mainstream maintenance.
More detailLess
A US-based manufacturing company with $500M revenue and operations across 12 countries was running SAP ECC 6.0 — approaching end of mainstream maintenance. Each country had its own customized SAP instance, creating a fragmented landscape of 12 separate systems with inconsistent master data, different chart of accounts structures, and 340+ custom ABAP programs. Monthly consolidated reporting took the finance team 8 business days. Supply chain visibility across countries was essentially non-existent — planners relied on spreadsheets emailed between locations. The board had mandated a single global SAP S/4HANA instance within 18 months, with the IT budget approximately 40% of what Big 4 consulting firms had quoted.
Our approach
We deployed a 10-person offshore team: 2 SAP S/4HANA architects, 3 ABAP/Fiori developers, 2 functional consultants (FI/CO and MM/SD), 1 basis/infrastructure eng...
More detailLess
We deployed a 10-person offshore team: 2 SAP S/4HANA architects, 3 ABAP/Fiori developers, 2 functional consultants (FI/CO and MM/SD), 1 basis/infrastructure engineer, 1 data migration lead, and 1 project manager. Phase 1 (months 1-3): Fit-gap analysis across all 12 country instances. Identified 340 custom programs — 180 could be replaced by standard S/4HANA functionality, 95 needed modernization, and 65 were deprecated. Built a unified global chart of accounts and master data governance model. Phase 2 (months 4-8): Core S/4HANA configuration for the global template, including embedded analytics, Fiori UX for key users, and integration with existing WMS and MES systems. Phase 3 (months 9-14): Phased rollout to 12 countries in 4 waves (3 countries per wave). Each wave included data migration, local configuration, user training, and hypercare. Used SAP's Selective Data Transition approach to migrate 8 years of historical data. Phase 4 (months 15-16): Post-go-live optimization — performance tuning, additional Fiori apps, and advanced analytics dashboards.
Project timeline
-
Months 1-3
Fit-Gap Analysis
Analyzed 12 country instances, identified 340 custom programs (180 replaceable, 95 to modernize, 65 deprecated). Built unified global chart of accounts and master data governance model.
-
Months 4-8
Core Configuration
S/4HANA global template configuration including embedded analytics, Fiori UX, and integration with existing WMS and MES systems.
-
Months 9-14
Phased Rollout
Deployed to 12 countries in 4 waves (3 per wave). Each wave included data migration, local configuration, user training, and hypercare using SAP Selective Data Transition.
-
Months 15-16
Optimization
Post-go-live performance tuning, additional Fiori apps, and advanced analytics dashboards.
The results
All 12 country operations went live on a single SAP S/4HANA instance within 16 months — 2 months ahead of the 18-month deadline.
More detailLess
All 12 country operations went live on a single SAP S/4HANA instance within 16 months — 2 months ahead of the 18-month deadline. Monthly close was reduced from 8 business days to 3. Real-time supply chain visibility across all 12 countries enabled $2.1M annual inventory reduction. Custom code was reduced by 53% (from 340 to 160 programs), significantly lowering maintenance costs. The project was delivered at 42% of the cost quoted by Big 4 firms, with the offshore team working in daily overlap with the client's US-based project sponsors. User satisfaction scores averaged 4.2/5 across Fiori applications.
“After two failed attempts with Big 4 firms, Offshore1st's SAP team delivered our S/4HANA migration on time and under budget. The quality of their functional consultants is outstanding — they challenged our assumptions and helped us simplify processes we'd been over-engineering for years.”